杰瑞能服

Well Completion Services
Well Completion Services

Provide overall well completion scheme design, tool products and on-site technical services to ensure efficient development of oil and gas wells

Well Completion Services
Jereh can provide well completion integration services, which can provide overall well completion program design, tools and on-site technical services for different well types and different well conditions (high temperature, high pressure, high sulfur wells), and efficient development of oil and gas wells. Have formed the leading domestic completion technology in terms of production completion, horizontal well completion, and characteristic completion technology.
Service Capability
Jereh has 12 completion teams that consist of more than 70 service engineers and professional technicians at all levels, 95% of which own bachelor degree or above, and have multi-language ability and rich international work experiences. It provides a customized service package from design to product provision to on-site engineering services for the specific well conditions as per customer’s requirements. At present, Jereh owns nearly 20 leading completion technologies, which can provide the integrated well completion solutions fitting for the different geological and engineering condition. In particular, Jereh has rich well completion experiences in unconventional tight oil & gas reservoir with low porosity, low permeability.
  • Horizontal Well Completion Technology Services
  • Specialized completion technology Services
  • Production Completion Technology Services
Service Performance
Jereh has provided various completion services for customers in Daqing, Shengli, Shaanxi, Sichuan, Xinjiang, Russia and other areas. As of year 2021, more than 850 horizontal wells with more than 3400 stages fracturing services have been completed. Among which, the coiled tubing multi-stage fracturing service for western drilling set records of single trip run of tools fracturing 55 stages and perforating 57 stages, and fastest fracturing 11 stages in 24-hours.